FAT (Factory Acceptance Test)
The complete validation test for the equipment will be performed at Comecer ’s site. The FAT protocol will include the following tests:
- Test Instrument Data (Calibration Certificates of the reference instruments)
- System Documentation Verification (documents list for the equipment qualification)
- Construction Design Verification (“As Built drawings and schemes”)
- Main Equipment Specification Verification (correspondence with the design)
- Functionality/Interlocks Verification (Mechanical & Software)
- Glove Breach Test (only where gloves provided)
- Unidirectional Air Flow Verification (Smoke pattern test - only with Laminar flow)
- Air Change Rate
- Air Velocity Verification (only with Laminar flow)
- Filter Leakage (Integrity test)
- Leak tightness Test (only if applicable)
- Non Viable Particle Counts (Air classification)