FAT Factory Acceptance Test

Свяжитесь с нами для получения дополнительной информации

The complete validation test for the equipment will be performed at Comecer ’s site.

The FAT Factory Acceptance Test protocol will include the following tests:

  1. Test Instrument Data (Calibration Certificates of the reference instruments)
  2. System Documentation Verification (documents list for the equipment qualification)
  3. Construction Design Verification (“As Built drawings and schemes”)
  4. Main Equipment Specification Verification (correspondence with the design)
  5. Functionality/Interlocks Verification (Mechanical & Software)
  6. Glove Breach Test (only where gloves provided)
  7. Unidirectional Air Flow Verification (Smoke pattern test — only with Laminar flow)
  8. Air Change Rate
  9. Air Velocity Verification (only with Laminar flow)
  10. Filter Leakage (Integrity test)
  11. Leak tightness Test (only if applicable)
  12. Non Viable Particle Counts (Air classification)

Contact us for more information

Fill in the form below to contact us



According to Italian laws you must give us your consent to use your personal information. Please read our privacy policy.
 
 

Subscribe to our Newsletter

News and invitations to events and fairs directly in your mailbox