FAT Factory Acceptance Test

Scarica il PDF

Attenzione! I contenuti di questa pagina sono disponibili solo nelle seguenti lingue: Inglese - Russo

The complete validation test for the equipment will be performed at Comecer ’s site.

The FAT Factory Acceptance Test protocol will include the following tests:

  1. Test Instrument Data (Calibration Certificates of the reference instruments)
  2. System Documentation Verification (documents list for the equipment qualification)
  3. Construction Design Verification (“As Built drawings and schemes”)
  4. Main Equipment Specification Verification (correspondence with the design)
  5. Functionality/Interlocks Verification (Mechanical & Software)
  6. Glove Breach Test (only where gloves provided)
  7. Unidirectional Air Flow Verification (Smoke pattern test – only with Laminar flow)
  8. Air Change Rate
  9. Air Velocity Verification (only with Laminar flow)
  10. Filter Leakage (Integrity test)
  11. Leak tightness Test (only if applicable)
  12. Non Viable Particle Counts (Air classification)

Download

Compila il modulo per scaricare il pdf

Ai sensi del Decreto Legislativo n. 196/2003 la informiamo che i dati personali che ha appena inserito saranno trattati nel pieno rispetto di tale legge. Selezionando "Acconsento" esprime il consenso alla raccolta e al trattamento dei dati personali da parte di Comecer SpA. Prima di procedere leggere attentamente la nostra privacy policy.
 
 

Iscriviti alla nostra Newsletter

Novità, inviti ad eventi e fiere direttamente nella tua casella di posta